SEARCH
Company Index ยป
  • NEWS
    & INFO
    NEWS & INFO
    • NEWS
    • EVENTS
    • INTERVIEWS
    • EXEMPLARY PROJECTS
    • FREE DIGITIAL RESOURCES
    • BLOG
    • COMPANY INDEX
    • INDUSTRY ASSOCIATION
  • Planning
    & Design
    Planning & Design
    • LANDSCAPE ARCHITECTS
    • LANDSCAPE DESIGNERS & TECHNICIANS
    • LANDSCAPE CONTRACTORS
    • HORTICULTURAL CONSULTANTS
    • ARBORICULTURAL CONSULTANTS
    • PROJECT MANAGEMENT & CONSTRUCTION
    • CONSULTING ENGINEERS
    • QUANTITY SURVEYORS
    • PROFESSIONAL REPRESENTATION
    • ENVIRONMENTAL CONSULTANTS & SERVICES
  • Site
    Preliminaries
    Site Preliminaries
    • BUSINESS ADMINISTRATION
    • HARDWARE & GARDENING EQUIPMENT
    • CONSTRUCTION EQUIPMENT
    • PERSONAL PROTECTIVE CLOTHING & EQUIPMENT
  • Environmental
    Management
    Environmental Management
    • CIVIL CONSTRUCTION & DEMOLITION
    • BUSH REGENERATORS
    • EROSION CONTROL & SOIL STABILISATION
    • HERITAGE & RESTORATION SERVICES
    • GREEN ROOFS & GREEN WALLS
  • Water
    Management
    Water Management
    • WATERPROOFING & JOINTING COMPOUNDS
    • DRAINAGE
    • IRRIGATION
    • STORM & WASTE WATER SYSTEMS
  • Hard Landscaping
    Structural Elements
    Hard Landscaping - Structural Elements
    • ACCESS CONTROL SYSTEMS
    • ARCHITECTURAL METALWORK
    • SHADE, HEATING AND COOLING SYSTEMS
    • LANDSCAPE STRUCTURES
    • PLAYGROUND, FITNESS AND RECREATION
    • EXTERIOR, BOUNDARY AND RETAINING WALLS
    • SIGNAGE
    • SPORTS SURFACES & EQUIPMENT
    • STREET, PARK & OUTDOOR FURNITURE
  • Hard Landscaping
    Product Supply
    Hard Landscaping - Product Supply
    • BRICKS & PAVING SUPPLIERS
    • CONCRETE
    • EXTERIOR LIGHTING
    • GARDEN ACCESSORIES
    • GATES, FENCES & SCREENS
    • PAINTS & FINISHES
    • POOLS, SPAS & SAUNAS
    • STONE
    • TIMBER SUPPLIES
    • WATER FEATURES
    • CABLING, UTILITIES & INFRASTRUCTURE
    • PUBLIC ART
    • PERMEABLE SURFACES
  • Soft
    Landscaping
    Soft Landscaping
    • LANDSCAPE SUPPLIES
    • LAWN & TURF SUPPLIES
    • NURSERIES
    • PLANT & TURF CARE
    • INTERIOR PLANTSCAPE
  • Maintenance
    Services
    Maintenance Services
    • ARBORICULTURAL SERVICES
    • LANDSCAPE MAINTENANCE CONTRACTORS
    • LANDSCAPE ASSET MANAGEMENT
    • ROADWAY SERVICES
  • Information
    & Supplies
    Information & Supplies
    • TECHNICAL EQUIPMENT & SUPPLIES
    • INDUSTRY INFORMATION









HISTORIC MELBOURNE SITE GETS A MODERN TWIST

24 Apr 2024


The application for the Salter Brother's $276-million tower development on Collins Street has been approved by the City of Melbourne.



The proposed development is a 35-storey tower to be built above the heritage listed Rialto and Winfield buildings on Collins Street in Melbourne. The Future Melbourne Committee voted unanimously for its approval.

Cox Architecture designed the plans for the $276 million Salter project, which will be compromised of a mixed-use development featuring retail, office spaces, a luxury hotel and a club with meeting and conferences spaces.

The nearly 4,000 sqm site fronts Flinders Lane and Collins St, and is part of a group of five historic buildings. The five, built between 1881 and 1891, are currently all a similar height, width and level of detail, making up one of the most notable historic streetscapes in Melbourne. The plan includes the demolition of a building on the site built in the 1980s that encloses Winfield Square, and creating a new building in its place that would comprise the 273-key hotel and office space, as well as a club and meeting and conference spaces. Another 19 rooms would be located in the Rialto building with a footbridge connecting it to the other buildings.

Winfield Square would then become part of a link between Collins Street and Flinders Lane as well as an atrium to connect the new podium with the heritage buildings. The proposed building takes shape as a tower atop a podium, while the materiality of the facade comprises glass, bronze aluminium details and aluminium louvres. The tower tapers in from the western boundary, resulting in a gap in the airspace between the roof of the Rialto building and the proposed tower.

The developer Salter Brothers stated that if the project is approved, construction would commence in 2025. The duration of the project is anticipated to take three years.

Images courtesy of Cox Architecture 

Historic Melbourne Site gets a Modern Twist
Universal Magazines
SEARCH




MORE NEWS

MAJOR DEVELOPMENTS IN MELBOURNE'S AIRPORT RAIL LINK
SEVEN HILLS COMMUNITY HUB TO TRANSFORM BLACKTOWN
MURRAMARANG SOUTH COAST WALK NOW OPEN
WORKS TO BEGIN ON MAJOR MELBOURNE DOCKLANDS DEVELOPMENT
THE GROUNDS TO TRANSFORM HISTORIC DOMAIN PRECINCT
CONSTRUCTION RAMPS UP AT MELROSE PARK





PROMOTE YOUR BUSINESS
MEDIA KIT
ORDER ODS
SITEMAP
ABOUT US
PRIVACY POLICY
TERMS & CONDITIONS
CONTACT US.
INDUSTRY ASSOCIATIONS
SUBSCRIBE TO OUR ENEWS


Send Enquiry