ORAN PARK


The Oran Park riparian corridor proved to be a challenging project. The riverbed was compacted during the construction process and the ground was practically impenetrable.

Factor3 utilised their specifically designed F3 tools, which assisted in creating a suitable hole for planting and also ensured minimal air pockets, providing the tube stock with the optimum growing conditions.

Info | 80,000+ tubestock over 4 weeks



Visit www.factor3.com.au
Send Enquiry To Factor3



Factor3 | ODS

Factor3

Revegetation, rehabilitation and construction planting