NORTH WARD ROAD® TOWNSVILLE

by ACO Pty Ltd

North Ward Road is one of the major arterial roads linking Townsville city with its northern suburbs. The recently completed $60M road upgrade posed a number of issues for designers.

The main challenge was to create an urban highway within a heavily restricted road corridor. The design solution also required the carriageway to be reconfigured from two lanes into four lanes while the road was being used.

ACO’s PowerDrain provided the ideal drainage solution. Major cost savings were achieved by eliminating a large number of side inlet gully pits in the elevated sections of the road.

The PowerLok® boltless grate locking mechanism ensures long term easy maintenance as it eliminates the need for cumbersome locking fixtures such as bolts.

For more product information visit: www.acodrain.com.au

Specifier: Flanagan Consulting Group
Product Featured: PowerDrain S300K with Iron Slotted grates
Other ACO Products Used: ACO Drain® trench drains and ACO Cablemate® cable pits
 





Website
Send Enquiry To ACO Pty Ltd